Author ORCID Identifier

https://orcid.org/0000-0002-7956-5076

Document Type

Article

Publication Date

1974

Abstract

This report summarizes a study conducted by Battelle, Pacific Northwest Laboratories (Battelle-Northwest) f o r the Atomic Energy Commission. It represents an interdisciplinary effort to extend a methodology (recently developed at Battelle-Northwest) for siting nuclear power plants to the problem of routing electric power transmission lines. The methodology incorporates both public values and technical assessments.

Comments

Also published by the United States. Dept. of Energy; Distributed by the Office of Scientific and Technical Information, U.S. Dept. of Energy, Washington, D.C., Oak Ridge, Tenn., 1974

Included in

Economics Commons

Share

COinS